Head Office Langfruit, Venlo

CategoryIndustry, Office
ClientLangfruit Fruit & Vegetables
LocationVenlo
Construction costs£5,600,000 (excluding VAT, including installations)
Architect:Quant Architecture
Project Description

The project located at Freshpark Venlo comprises the new construction of the head office and the logistics hall for Langfruit Fruit & Vegetables. The building includes a climate-controlled (8 – 18 °C) logistics hall with nine cold stores (0 – 12 °C) and offices.

Factsheet
  • Office: 700 m2 BVO
  • Logistics hall: 10,000 m²2 BVO
  • 20 load docks
  • 9 cold rooms
  • Heat recovery from cooling hall for office
Project duration
  • Project start: December 2004
  • Start of construction: September 2006
  • Delivery: September 2007
VB&T Activities

vb&t Projectmanagement carried out the complete cost and project management for this project, from the initiation phase through to the aftercare phase. The project included, among other things, the following activities:

  • Feasibility study(ies)
  • Prepare Programme of Requirements
  • Plan development with external consultants and contractor
  • Cost management
  • Selection, pricing and contract formation
  • Project management during realisation including procurement and coordination for interior design and landscape design
  • Aftercare